FREE SHIPPING ON ORDERS OVER $70
Previous
Providence Engraving Pet ID Tags Aluminum Custom Engraved-0

Providence Engraving Pet ID Tags Aluminum Custom Engraved

Original price was: $4.88.Current price is: $4.64.
Next

Petank Dog Harness Jacquard Mesh Reflective Step In Design

Price range: $8.54 through $8.81
Petank Dog Harness Jacquard Mesh Reflective Step In Design-0

MANDOG Dog Training Leash Nylon Long Lead Recall Obedience

Price range: $6.64 through $6.85

This MANDOG dog training leash offers a durable nylon construction and tangle-free swivel clasp, providing your dog with safe freedom during recall and obedience training. Available in multiple colors and lengths, it’s suitable for small, medium, and large dogs. Enhance your training sessions with this reliable, easy-to-use long lead.

SKU: CJNWRSB07S3W Category:
Trust Badge Image

Description

Product Overview

The MANDOG Dog Training Leash is crafted from strong, wear-resistant nylon, ensuring durability and reliability during training sessions. With a standard width of 3/4 inch and available in lengths from 15ft to 100ft, this leash provides ample space for your dog to wander while maintaining control. It features a 360-degree tangle-free swivel bolt snap that resists twisting, offering maximum freedom and ease of use. Available in a variety of colors including reflective options for enhanced visibility, this leash is designed to meet the needs of dog owners seeking effective training tools. Product dimensions are 4.72 x 4.53 x 0.59 inches, weighing 4.34 ounces, making it lightweight and portable for outdoor activities.

MANDOG Dog Training Leash in use during recall training

Usage

This training leash is ideal for teaching recall, obedience skills, and providing controlled freedom in open areas such as parks, backyards, and training grounds. It suits small, medium, and large dogs, helping puppies and adult dogs learn commands safely. Use it during walks, agility practice, or socialization sessions to build trust and discipline without compromising safety.

Why Choose Us

MANDOG leashes stand out due to their high-quality nylon material and robust construction, tested for wear resistance and longevity. The swivel-style clasp prevents tangling, ensuring a smooth training experience. Backed by positive customer reviews and a commitment to satisfaction, we offer reliable products that enhance the bond between you and your pet.

Key Features

  • Durable nylon material for long-lasting use in various conditions
  • Tangle-free 360-degree swivel bolt snap for effortless handling
  • Multiple lengths and colors, including reflective options for safety
  • Ideal for recall training and obedience exercises with all dog sizes
  • Lightweight design for easy portability during outdoor activities

FAQ

What is the maximum weight this leash can handle?

The leash is designed for small, medium, and large dogs, with a strong nylon construction that withstands typical pulling forces during training.

Is the clasp rust-resistant?

Yes, the swivel bolt snap is made to resist rust and twisting, ensuring durability in different weather conditions.

Can I use this leash for puppies?

Absolutely, it’s suitable for puppies to teach recall and basic obedience in a safe, controlled manner.

How do I clean the leash?

Wipe with a damp cloth and mild soap, then air dry to maintain the nylon material and clasp functionality.

Are reflective options available for night use?

Yes, reflective colors like red, blue, and green are offered to improve visibility during low-light training sessions.

Additional information

Color

100ft, 20ft, 15ft, 50ft, 30ft

Size

Reflective Red, Reflective Blue, Orange, Reflective Green, Green, Reflective Brown, Reflective Purple, Rainbow, Blue, Black, Reflective Orange, Purple, Red, Reflective Black, Brown

Reviews

There are no reviews yet.

Be the first to review “MANDOG Dog Training Leash Nylon Long Lead Recall Obedience”

Your email address will not be published. Required fields are marked *

Recently Viewed Products

Shopping cart

3

Subtotal: $29.10

View cartCheckout